Only 3 weeks left till we move back in! Hardwood refinishing next week, painting the following week. HVAC and electricity should be turned on tomorrow and the plumber and tile should be sometime next week too. Here's lots of pictures!
|
This is the hardwood that was under the carpet in the living room. The living room was the only room with carpet. Now all floors will be original hardwood. Can't wait to see it finished! |
|
Doors are in, and trim is going in. Still got a long way to go on trim though. |
|
MY KITCHEN!!! I absolutely love it! Green quartz contertop with yellow walls. It will look fabulous! |
|
The other side of the kitchen. The sink/dishwasher side. |
|
Double oven range and dishwasher are still in the box. Can't wait to see them too. I am so excited to have a double oven! |
|
The buffet side of the kitchen and the kitchen pantry! Can you tell I love my kitchen?!?! |
|
This is the master bath with the new floor and vanity. The kid's bath has the same flooring and a matching single vanity. |
|
Close up of the master vanity. |
|
Closets in the master bedroom. I took this photo to show trim again. Also in the picture is the clawfoot tub which has to be re-finished because it was brought to the project site after refinishing and got destroyed. The tile for the master shower and kid's shower is in the boxes in the picture. They should go in early next week. |